Working inside producing oil fields

We cross under the road — without cutting it open

Trenchless horizontal directional drilling for pipelines beneath roads, rivers and live facilities — no open-cut trench, no traffic shutdown, no surface reinstatement.

1,200mm

Largest diameter delivered

700m

Longest crossing delivered

5

Oil fields

Since2005

Projects delivered

Our services

Five disciplines, anchored in directional drilling

All services ←

Track record

HDD Crossings Register

Every entry is documented in the official company profile or an execution contract.

Track record

Projects documented in numbers

All projects ←

From the field

Short clips, with the site's own sound, from actual work sites. Nothing downloads until you tap — to protect your data allowance.

Why trenchless?

We cross the obstacle instead of opening it

Cross-section of a horizontal directional drilling operationA diagram showing the drill path: it begins at an entry point on the surface, descends beneath an existing road through soil strata, then rises to an exit point on the far side — without opening a trench in the road.Existing roadEntry pointExit pointØ 1,200 mm400 m

Diagram drawn to the scale of a delivered project — Al-Tobji Bridge — 1,200 mm crossing · 2025

  • 01

    No traffic shutdown

    The road or bridge stays open for the whole works — no diversions, no closure.

  • 02

    No surface reinstatement

    No open trench means no new paving and no kerbs broken then patched.

  • 03

    Crossing what cannot be opened

    Rivers, railways and live facilities are crossed underneath on a precisely steered path.

Working inside producing oil fields

We execute HDD crossings inside producing oil fields in Iraq — among them projects delivered as a subcontractor under the contract of Al-Misk Oil Projects Company.

Have a difficult crossing?

Sketch us the route and we will come back with a technical and commercial offer shortly.