We cross under the road — without cutting it open

Trenchless horizontal directional drilling for pipelines beneath roads, rivers and live facilities — no open-cut trench, no traffic shutdown, no surface reinstatement.

1,200mm

Largest diameter delivered

700m

Longest crossing delivered

5

Oil fields

Since2005

Projects delivered

Our services

Five disciplines, anchored in directional drilling

All services

Track record

HDD Crossings Register

Every entry is documented in the official company profile or an execution contract.

Track record

Projects documented in numbers

All projects

From the field

Short clips, with the site's own sound, from actual work sites. Nothing downloads until you tap — to protect your data allowance.

Why trenchless?

We cross the obstacle instead of opening it

Cross-section of a horizontal directional drilling operationA diagram showing the drill path: it begins at an entry point on the surface, descends beneath an existing road through soil strata, then rises to an exit point on the far side — without opening a trench in the road.Existing roadEntry pointExit pointØ 1,200 mm400 m

Diagram drawn to the scale of a delivered projectAl-Tobji Bridge — 1,200 mm crossing · 2025

  • 01

    No traffic shutdown

    The road or bridge stays open for the whole works — no diversions, no closure.

  • 02

    No surface reinstatement

    No open trench means no new paving and no kerbs broken then patched.

  • 03

    Crossing what cannot be opened

    Rivers, railways and live facilities are crossed underneath on a precisely steered path.

Working inside producing oil fields

We execute HDD crossings inside producing oil fields in Iraq — among them projects delivered as a subcontractor under the contract of Al-Misk Oil Projects Company.

Have a difficult crossing?

Sketch us the route and we will come back with a technical and commercial offer shortly.