Trenchless Drilling & Sewer Works
Al-Tobji Bridge — 1,200 mm crossing
Trenchless drilling works at Al-Tobji Bridge with installation of a 1,200 mm diameter pipe over 400 metres.
- Location
- Baghdad
- Diameter
- 1,200 mm
- Length
- 400 m
- Year
- 2025
Site photographs
More in this discipline

Khor Al-Zubair field — crossing works

Shatt Al-Basra — steel pipeline works for oil projects

Execution of crossing works within the projects of Al-Misk Oil Projects Company in the Halfaya, Majnoon and Gharraf fields
Al-Misk Oil Projects Company
2024
Hammar (Mishrif) Field — carbon steel pipeline crossing
Length 460 mCarbon steelMövenpick Hotel — Green Zone
Mövenpick Hotel
Diameter 630 mmLength 400 m2025Diyala Sewerage — Polyethylene pipeline
Diyala Sewerage Directorate — subcontract with Fourth Dimension Company
Diameter 630 mmLength 700 mPolyethylene2024