Trenchless Drilling & Sewer Works
Hammar (Mishrif) Field — carbon steel pipeline crossing
A horizontal directional drilling crossing with a carbon steel pipe over 460 metres inside the Hammar (Mishrif) field in Basra.
- Location
- Basra — Hammar field
- Length
- 460 m
- Pipe material
- Carbon steel
- Oil field
- Hammar (Mishrif)
Site photographs
More in this discipline

Khor Al-Zubair field — crossing works

Shatt Al-Basra — steel pipeline works for oil projects

Execution of crossing works within the projects of Al-Misk Oil Projects Company in the Halfaya, Majnoon and Gharraf fields
Al-Misk Oil Projects Company
2024
Al-Tobji Bridge — 1,200 mm crossing
Diameter 1,200 mmLength 400 m2025Mövenpick Hotel — Green Zone
Mövenpick Hotel
Diameter 630 mmLength 400 m2025Diyala Sewerage — Polyethylene pipeline
Diyala Sewerage Directorate — subcontract with Fourth Dimension Company
Diameter 630 mmLength 700 mPolyethylene2024