Core specialisation
Trenchless Drilling & Sewer Works
Crossings inside producing oil fields, and pipeline installation beneath roads, rivers and live facilities using horizontal directional drilling — no open trench, no traffic shutdown.
Crossings inside oil fields
Crossings delivered inside producing oil-field projects as a subcontractor.
Road & bridge crossings
Crossings beneath highways and existing bridges, in diameters up to 1,200 mm.
Trenchless sewer pipelines
Polyethylene and steel pipelines for sewerage and water networks.
From the field
Short clips, with the site's own sound, from actual work sites. Nothing downloads until you tap — to protect your data allowance.
Site photographs
These photographs come from this discipline's page in the company profile and cover more than one project, so they are shown here rather than attributed to a single project.
More in this discipline

Khor Al-Zubair field — crossing works

Shatt Al-Basra — steel pipeline works for oil projects

Execution of crossing works within the projects of Al-Misk Oil Projects Company in the Halfaya, Majnoon and Gharraf fields
Al-Misk Oil Projects Company
2024
Hammar (Mishrif) Field — carbon steel pipeline crossing
Length 460 mCarbon steel
Al-Tobji Bridge — 1,200 mm crossing
Diameter 1,200 mmLength 400 m2025Mövenpick Hotel — Green Zone
Mövenpick Hotel
Diameter 630 mmLength 400 m2025Diyala Sewerage — Polyethylene pipeline
Diyala Sewerage Directorate — subcontract with Fourth Dimension Company
Diameter 630 mmLength 700 mPolyethylene2024